Font Size: a A A

Study On Investment Control Of North Outer Ring Gathering Gas Pipeline Project

Posted on:2016-10-31Degree:MasterType:Thesis
Country:ChinaCandidate:Y HeFull Text:PDF
GTID:2279330467999579Subject:Project management
Abstract/Summary:PDF Full Text Request
Oil, an important strategic resource, has become an indispensable strategy that full speed to build national energy channel and oil-gas pipeline network during the "Twelve Five" period. Nearly, there are some problems in PCL southwest, for instance:the CNPC Southwest Branch oil-gas pipeline engineering construction is relatively concentrated, and higher demand for time schedule; project management resources and building capacity are inadequate; investment control in the pipe project is relatively weak, it often happens that project settlement behind schedule, embezzle the reserve fund, change estimates and so on. Up to now,"North Outer Ring Set Gas Pipeline" project is the largest pipeline project of the Southwest Oil and Gas Branch. In order to promote the standardization of construction projects, the Southwest Oil and Gas Branch decided to adopt "North Outer Ring Set pipeline" project as an investment cost of standardized management pilot demonstration project. Hence, How to control the investment cost appropriately seems so important that scholars should study and solve.Depending on the present investment cost management situation of the Southwest Oil and Gas Branch, according to many factors that influence total investment and problems of management, writer chose "North Outer Ring Set pipeline" project as the research object, adopted several analytic methods-the work decomposition, earned value, checklists and moving control method-the PDCA Circulation Patterns, and finally posed safeguard measures to control investment costs, built investment control early warning and correction mechanisms simultaneously.
Keywords/Search Tags:Pipeline project, Investment control, North Outer Ring Set Gas Pipeline Project
PDF Full Text Request
Related items