Font Size: a A A

Performance Optimization Of 600MW Unit To Realize The Biggest Benefit Of Factory

Posted on:2017-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:X Q YangFull Text:PDF
GTID:2272330488485472Subject:Power engineering
Abstract/Summary:PDF Full Text Request
To improve the efficiency of the unit, decrease coal consumption, improve the capacity, increase profitability of company, Inner Mongolia Daihai Electric Power Generation Co. Ltd (hereinafter referred to as Daihai Power) has done mining unit power generation potential since 2009.Power generation companies present increasing the nameplate output, the number of hours in use of the unit, the capacity. After the full discussion with manufacturer, design institute, electric institute, Daihai Power will increase the capacity from 600MW to 630MW, in order to finish derperformance optimization by increasing capacity and reduceing consumption (quantity).Following the implementation of the two conditions, North China Power Gride Ltd puts forward high requestion about daily generation dispatch scheduling curve, primary frequency modulation, regulation speed of AGC (Automatic Generation Control) regulation precision of AGC. optimize the coordinate system, increase the profitability of the two conditions, Power Plant can earn more compensation from Power Grid Ltd, in order to finish derperformance optimization by regulating characteristic (quality).Daihai Power is a North China Power Grid straight 600 MW coal-fired thermal power unit. North China Power Grid Ltd schedules plant load by equal distribution.The way is not the best energy-saving economic operation. The way does not reflec the principle of energy conservation priority. By optimizing optimal load distribution method, we can realize maximizing of the benefits.
Keywords/Search Tags:optimize, increasing the capacity, throttle, equal incremental cost rule
PDF Full Text Request
Related items