Font Size: a A A

Cost Control Of Wind Power Project Construction

Posted on:2017-01-02Degree:MasterType:Thesis
Country:ChinaCandidate:S Y XieFull Text:PDF
GTID:2272330488455124Subject:Business administration
Abstract/Summary:PDF Full Text Request
As our country pay attention to the wind power industry, wind power industrial development rapidly, but the reality is that China’s wind power project cost is high, and the high cost of wind turbine generator is the main obstacle that baffles the development of wind power industry in our country. So reducing the cost of wind power, especially the cost of new wind power have important sensor to our wind power market.Wind power cost is mainly composed of the land cost, wind turbine generator cost and project construction cost, land cost mainly comes from the government and the owners, the cost of wind turbine is related to the development of technology, this article main to analysis the wind power project construction cost control.Wind power project construction cost content installation cost, construction cost and other costs. The raw materials such as steel, copper, and building materials also influence the wind power project cost. At the same time strengthening the scientific management, it is important to control the project construction cost.This article first introduce the wind power in the electricity market reform background, referral the wind power cost control research status, introducing the theory of cost control, including the cost control principle and procedures, methods, At the same time introduces the wind power project construction process, key process and the combination of non-critical process, objective analysis of the factors affecting wind power project cost control, through to the key working procedure and non-critical process adjustment, through the worker cost, machinery cost, the cost of materials to control the overall cost of project.
Keywords/Search Tags:Wind power, Cost control of construction, Builder, Key procedure
PDF Full Text Request
Related items