Font Size: a A A

Research On The Project Transform Of A Power Enterprise’s Low Temperature Saving Coal Device

Posted on:2017-04-16Degree:MasterType:Thesis
Country:ChinaCandidate:H L ChenFull Text:PDF
GTID:2272330482992298Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
At present, with our economy rapid economic development, the national policy on environmental protection and energy saving is becoming a very serious issue. Although our country coal resource is a lot,but per capita ownership is not much. And due to the unreasonable way of coal use has also led to much waste. To save energy in our country, is getting people’s more attention. In the continuous development of renewable energy, at the same time, also want to save energy use,this has been the focus of our attention. For the power plants,the power enterprise’s low temperature saving coal device greatly meet to the requirement of the people’s power requirement,and can promote to save resources and protect the environment,to create a conservation-minded society.Due to the power supply problem is the key to the problem of people’s livelihood, “A” power plant as Y city’s largest electric power supply company,affect such a wide range, especially for people’s livelihood and economic development. It has played a very important role. In addition, “A” power plant power enterprise’s low temperature saving coal device project innovation,can improve the use efficiency of coal resources use, and also can save energy and protect the environment. This project respond to our country’s reducing the consumption of energy saving and emission reduction policy, after transforming will greatly save energy,reduce the waste of resources. However,due to the power plant project is complex, for example, the project influence scope is very wide,and also,it need longer time to prepare the early stage of the project, construction period is also longer,the scale of the project financing is larger and the cost recovery is relatively slow,such as these issue will make the transformation process of the whole project to face many risks. It needs to deepen the theory of project management,strengthen the monitoring ability of the project management process. This project belongs to the renovation project, and puts forward higher requirements to the project management.Renovation project refers to using the new technology or methods, the existing project or production mode for further perfecting or processing, optimize resources, improveefficiency.In this paper,through the study and exploration of the renovation project of A power plant project management theory,in the early stage of the project start with planning and design,project implementation stage and its monitoring stage,each stage end projects and project acceptance and so on to be controlled. According to current situation of the development of the project and the risk of a proposed solution,optimize every stage of the control and regulation,can not only reduce the waste of project resources, but also can reduce the waste of resources, project implementation,and also meet its economic benefits and environmental benefits.
Keywords/Search Tags:Low temperature saving coal device, Reconstruction project, Energy saving
PDF Full Text Request
Related items