Font Size: a A A

Study On Management Of General Contract Project

Posted on:2017-02-17Degree:MasterType:Thesis
Country:ChinaCandidate:X J ZhangFull Text:PDF
GTID:2272330482989677Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
In order to meet the needs of the reform of market economic system, China gradually in the construction project implementation of construction project general contracting management model, proposed the establishment of the idea of project general contracting enterprises, with intelligence intensive engineering general contracting company(Group) as a "leading", the professional construction enterprises rely on, national and collective, contractor and subcontractor, division of labor and cooperation, complement each other, in order to adapt to the needs of the international construction market, improve the level of the management and construction of the construction enterprises of our country, increase the competition ability of the construction industry.There is no doubt that the construction enterprises of our country are built in a low cost on the basis of the system, the management level is still lagging behind the international construction market demand. After the accession to the world trade organization, China’s construction market has gradually foreign, "into the world" the impact of the more violent, its impact on the construction industry strong to the Lubuge shock several times or even dozens of times, because the Lubuge shock "let us about the current situation of the construction management level of our country, and" into the impact of the world "will affect the survival of construction enterprise in our country.Practice has proved that the implementation of the project general contracting is conducive to optimize the allocation of resources; to optimize the organizational structure and the formation of scale economy; is conducive to the control of engineering cost, enhance the level of bidding; is conducive to the improvement of the comprehensive performance ability, and to ensure that the quality and time limit for a project; is conducive to promoting management modernization; is conducive to government departments to break the monopoly of the industry, and concentrate the construction market is the most prominent problem solving, but also conducive to implementing the risk security system.The in view of the construction project general contracting management were studied the construction project general contracting management needs to have the ability of five: capability of project management, design management ability, management ability in business contract, coordination and management ability, public resource management ability, and discusses the necessity and the method of the five kinds of abilities to create. In addition, this paper from the perspective of IE, in Shenyang in the Construction Bureau of an engineering project construction contract management as an example of how to use IE theories and methods of enhancement of enterprise project construction general contract management ability in practice and improve the efficiency of enterprise construction project general contracting management. To further improve the project construction contract management theory, and has certain guiding significance to the practice of enterprise project construction contract management.
Keywords/Search Tags:Construction Project Management, General Contracting, Cost Control
PDF Full Text Request
Related items