The Engineering Project’s Management And Practice Of Yongjin Expressway’s Yinzhou Connecting Line

Posted on:2016-09-28Degree:MasterType:Thesis
Country:ChinaCandidate:G HuangFull Text:PDF
GTID:2272330482967856Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction mode of public-private partnerships is a new construction mode which is advocated by our government, and it has a profound strategic influence on the national economic construction. It has been a short time since the emergence of the construction mode, but the role played by the mode is positive and significant, it adapted to the construction situation in our country, so it has sprung up in large numbers, but precisely because such construction mode is still in its infancy in China’s transport infrastructure construction, due to a variety of factors, objectively, the current management has not been standardized, by the construction project’s management and practice of of Yongjin expressway’s Yinzhou connecting line, and then establish an investment project management system of feasible operation, scientific management, and controllable risks, this has great significance for the standard, healthy and orderly development of the traffic infrastructure construction.This paper centers on the project’s construction period management of the Yongjin Expressway’s Yinzhou connecting line, and is elaborated from the early management stages of the project,project organization structure erection, the process design of the project management, schedule planning, quality safety, cost control and other items, build implementation programs by by using all kinds of management theories, technology and experience, analyze and optimize the actual project management, realize the goal of guarding against all kinds of risks, ensure the engineering quality, achieve the comprehensively economic and social benefits.Through the construction management practice of the engineering project, establish a scientific and effective construction and management system for the same projects, thus accumulating technical data, and this can provide reference for the scientific and standardized management of the same projects in the future.
Keywords/Search Tags:Public-private partnership model, Engineering construction, Management practice
PDF Full Text Request
Related items