Research On Project Cost Management Of Jingshi Building Construction Project In Dezhou City

Posted on:2016-06-21Degree:MasterType:Thesis
Country:ChinaCandidate:W DongFull Text:PDF
GTID:2272330482964067Subject:Project management
Abstract/Summary:PDF Full Text Request
Real estate project cost management is the key to engineering construction cost, which determines the success or failure of real estate project construction. Project cost of investment has a pivotal role of benefit and social benefit of the progress. In Dezhou the continuous economic development led to the development of real estate industry, economic development plays a catalytic role in development of office and residential buildings. Dezhou is crystal building construction project came into being. In this context, Jingshi building construction project arises at this moment. Generally, because the real estate projects have large investment, long cycle, high risk, etc, Jingshi building construction project needs an reasonable control of project cost, which is of vital importance for this project. Therefore, the paper introduces the theory of project cost management combined with Jingshi building construction project, and analysis the project cost management from the following aspects.This paper first explains theories of the project cost management and the real estate project cost management, and then introduces the status of development of Jingshi building construction project, analysis the project cost and cost management plan in project feasibility study stage. Based on this, the paper makes sure of the problems existing in current cost management plan, such as insufficient management continuity and affordable cost management. Then, the paper puts forward the project cost management objectives form both qualitative and quantitative point of view. Then, with the earned valued method, the paper makes real-time analysis of cost management of Jinshi building construction project, making sure of the management level. At last, the paper puts forward the targeted cost management measures and safeguard measures, such as cost management countermeasures of bidding stage, implementation stage and completion inspection and acceptance stage; and organization, technology, economy, management and protection.Through the research, this paper draws the following conclusion. The cost management of Jingshi building construction project involves many aspects, and existing lack of coherence and affordable. Then with the earned valued method, the paper makes real-time analysis of cost management, and finds that the cost of the project cost control will be in good condition to better achieve the objectives of the project cost management, but may lead to schedule delays. In order to achieve the goal of the general management of project cost management, Jingshi building construction project should make cost management from the bidding stage, implementation stage and completion inspection and acceptance stage at different stages, and providing adequate organization, technology, economy, management and security system.
Keywords/Search Tags:Project Cost, Project Cost Management, Jingshi Building Construction Project, Earned Valued Method
PDF Full Text Request
Related items