Design Of Sino German Passive Energy Saving Demonstration Building Construction Cost Management Plan

Posted on:2016-04-03Degree:MasterType:Thesis
Country:ChinaCandidate:L N PengFull Text:PDF
GTID:2272330479999337Subject:Project management
Abstract/Summary:
Construction is the basic industry of our country, it is highly integrated, especially large state-owned construction enterprises have the special qualification of organization and management, because of its complex structure, an important problem facing such large-scale enterprise’s cost management, part of the construction project as the basis of construction enterprise, cost management of project department will become the embodiment of the cost management level of construction enterprise is the most direct. The main goal of the business is profitable, the control cost is equal to increase revenue, cost management is good or bad is a reflection of a reference surface enterprise profit. With the twenty-first Century international society widely proposed "energy saving water saving land saving material saving" green building concept to adapt, China introduced a passive energy-saving building the most new construction model, the project as a new building pilot project of Hebei province took the lead in investment and construction.Firstly, a detailed description of the research background and research meaning,put forward research content for the cost management of the project construction process the research object is a passive energy-saving building demonstration home first to introduce German technology Around the construction process of the project, from the theory illustrates the concept of cost management cost management objectives of the specific content of cost management, the necessity and method of use. The German passive energy saving demonstration building management organization pattern in system design, explain what is the construction process, what is the design goal and the design principle of cost management system, forecast, plan, control, accounting and other contents of the innovative design, project on the adoption of the new technology of key management and cost analysis of composition, determination the actual content. The introduction of stock management mechanism is currently the most popular social in the cost plan, in the whole process of detailed planning the details of the implementation of cost management. Finally, the German passive energy saving demonstration building cost management design scheme results summarized periodically, draw the design conclusion. In building construction, cost management is a dynamic and continuous process, need to keep on cost management details to adjust, in order to adapt to the new problems in project construction. Fine management and target decomposition management is the development direction of cost management in engineering projects.
Keywords/Search Tags:management through costs energy saving building, conceptual design excitation mechanism, details control
Related items