Study On Project Quality Management Of Liaodong Cogeneration Installation

Posted on:2013-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:L Y LiuFull Text:PDF
GTID:2272330473954239Subject:Project management
Abstract/Summary:PDF Full Text Request
Cogeneration technology in foreign countries, after nearly fifty years of development, has become a mature technology widely used.The cogeneration technology popularization in our country, the energy saving and emission reduction, environmental protection and improve social production efficiency has positive and realistic significance, in quite a long period of time and a wide space area also will develop quickly, annual installed capacity will also increase continuously, thermal power plant the construction demand still the larger.However, our new cogeneration engineering quality level and the operation efficiency and advanced foreign countries there is still a gap, the domestic support with the construction management technology is still not complete, and installation of construction enterprise quality management level should be improved, practitioners of occupation quality uneven, with installation of the construction quality management is still the direction.Home for the cogeneration project quality management research is limited, I hope that through this research on the establishment and development of cogeneration project quality management system, improve the quality of the project quality to make beneficial exploration.As an example of the topic in Liaodong cogeneration project, on the domestic cogeneration project installation of construction project quality management is studied, mainly to take interviews with experts and technical personnel, literature research, comparative analysis method.Comparison of domestic and foreign cogeneration technology development, project management and project quality management theory of knowledge and methods of tool application.In Chinese laws and regulations and technical requirements of the framework, put forward by cogeneration project quality appraisal system construction and the construction quality control implementation consists of cogeneration project quality management system.According to the project quality evaluation system construction, to identify similar common in engineering quality risk, using the analytic hierarchy process to quality risk assessment to obtain different quality risk of system quality influencing factor, make project quality evaluation standard system, and the construction process of the common quality defect control technology requirements of organizing, realize analysis evaluation and the standard basis for the combination of.According to the construction quality control implementation, put forward to cover all the construction quality management organization and responsibility system, the construction content is divided into conventional process, the key process and special process quality control, normative purchase, equipment and materials preservation and processing requirements for the control of nonconforming product.Direct air cooling system for construction process uncertainty the largest engineering division, focusing on the quality risk analysis, puts forward the control measures.On the construction of the final stages of the quality control and inspection to ensure the quality of engineering after the content, requirements specification.Finally, in view of this kind of project construction quality management in common quality risk, put forward prevention and quality risk and improve the quality management in construction enterprises measures.
Keywords/Search Tags:Cogeneration, Installation, Project quality management
PDF Full Text Request
Related items