Font Size: a A A

Study On Management Optimization Of A Construction Company Streetlight Installation Project Quality

Posted on:2016-08-21Degree:MasterType:Thesis
Country:ChinaCandidate:M L WuFull Text:PDF
GTID:2272330503953218Subject:Project management
Abstract/Summary:PDF Full Text Request
As social and economic development and rapid urbanization, both cities and rural areas as urban infrastructure street have been continuously developed. Street construction companies how to better complete the construction and street works in construction quality control, to improve their own competitiveness, is the actual problem every street construction companies must face and be valued. Quality management is inseparable from the development of street construction management system improvement and optimization of its own technical methods, street business units as a third party contractor street construction engineering services required in a changing market environment for its construction quality and technology The method of continuously optimized to meet the faster, more convenient service to provide street market environment. How better to complete the construction streetlight project a good grasp of the construction quality control, to achieve maximum efficiency in the construction business at the same time, it obtained good social and corporate image, it is every street construction enterprises must consider.Construction management system reform is constantly deepening development. The traditional management model has to keep up with an increasingly competitive market situation. High efficiency to achieve quality project must be carried out in the whole process of construction and process a full range of planning, organization, implementation, control and coordination of the system best management practices to achieve overall project quality control construction rhythm, perfect quality assurance system, to create a better quality of life in line with the requirements of modern urban road lighting project.This article analyzes from the A street lamp limited liability company’s current situation, the company street lamp installation engineering project construction process of quality management strategy optimization research. Are introduced in this paper streetlight project quality management in the current industry background and the situation at home and abroad, company background and combining with all kinds of quality problems that exist in the construction process, including procurement, positioning, excavation and backfilling, put the protection tube, grounding, masonry foundation building, poles, wear the power line, installing distribution box etc. various processes, all kinds of quality problems causes analysis, optimization methods and suggestions for improvement, then puts forward the optimization scheme, finally, the optimized results were analyzed and summarized.
Keywords/Search Tags:Lamp installation, construction process, quality management, optimize
PDF Full Text Request
Related items