Font Size: a A A

The Study Of Risk Management To Shouguang Sunshine Hospital Outpatient Building Construction Project

Posted on:2014-10-29Degree:MasterType:Thesis
Country:ChinaCandidate:W Q LiFull Text:PDF
GTID:2272330473954120Subject:Project management
Abstract/Summary:PDF Full Text Request
Development and construction of the building process due to various unforeseen factors, such as project investment, and slow recovery of funds, if not on guard, is likely to affect the smooth progress of development projects, and even lead to serious consequences. Therefore, it is important to identify and analyze risks and identify appropriate control measures to reduce project risk for the development and investment of the construction projects. In this paper, the basic theory of project risk management to ShouGuang Sunshine Hospital Outpatient Building construction project for the study, combined with the external environment within the project and its own characteristics, the use of risk identification, risk analysis and evaluation methods, namely the construction decision-making, pre-project, one by one at each stage of project risk identification, estimation and evaluation, and for the different characteristics of each stage propose appropriate risk response measures, and finally, the risk assessment and risk assessment AHP fuzzy Comprehensive Evaluation of combination analysis example, ShouGuang Sunshine Hospital for comprehensive outpatient building construction projects the whole process of risk assessment.Text is divided into five parts, the first part is the introduction of the domestic and international construction project risk status, proposed thesis research purposes. The second part is the risk management research to the construction project development, starting from the definition of risk, combining features of architectural development, a brief introduction of risk identification, estimation, evaluation and ways to cope. The third part introduces the ShouGuang Sunshine Hospital Outpatient Building construction project risk management various stages of development, namely the construction decision-making, pre-project, one by one at each stage of the project construction risk identification, estimation and evaluation and for the different characteristics of each stage propose appropriate risk responses. The fourth part introduces ShouGuang Sunshine Hospital Outpatient Building construction project development of the whole evaluation process, through risk estimation and evaluation, the use of fuzzy comprehensive evaluation analysis example, assessment ShouGuang Sunshine Hospital Outpatient Building construction project risk rating process. The fifth part gives the way to deal with according to the risk presented ShouGuang Sunshine Hospital Outpatient Building construction projects at different stages of risk response strategies.
Keywords/Search Tags:risk management, risk identification, risk assessment
PDF Full Text Request
Related items