Font Size: a A A

Research On Quality Management For Mobile Company Main Building In Puyang

Posted on:2015-09-02Degree:MasterType:Thesis
Country:ChinaCandidate:C C SunFull Text:PDF
GTID:2272330473450010Subject:Project management
Abstract/Summary:PDF Full Text Request
Project quality is essential; it is a matter of personal safety and security of state property, so it should be very seriously. Over the years, scholars for the quality of project management and control of in-depth research, research methods varied, very different research methods, total quality management (TQM), IS09000 quality management system, quality skills,6σ quality management, QC Group are all in the quality of project management and control has been applied, which, total quality management (TQM) is most widely used, of course, followed by a significant improvement in quality of the project. However, there are some projects in quality management problems, this paper as a starting point, made with total quality management (TQM) and QC Group a combination of methods to solve these problems, which is the innovation of this paper.This paper describes in detail the theory of quality management and control, making empirical research the main building of mobile company in Puyang City projects. Firstly, research background, purpose, meaning, literature, research ideas and methods made a note; then discusses the theory of quality management and control, with particular emphasis on the total quality management (TQM) and QC Group combined reason, the pattern used in construction projects as well as the feasibility of doing a detailed introduction; Secondly, the main mobile companies Puyang project quality management analysis to identify the existence of quality management issues; once again, the use of Total Quality Management (TQM) and QC Group project quality management methods to solve the problems that exist in the quality of management; Finally, conclusions and outlook, noting that total quality management (TQM) and QC Group can be combined, and can be applied to solve specific projects practical problems of practical significance.By analyzing quality management of main building of mobile company in Puyang found that there is "Full participation in quality management awareness is not strong," "Ignore the appearance of the details related to the quality of project management," "No to quantify the important process management" problem, so this study attempts to use a combination TQM and QC Group approach to the existing quality management issues to be addressed.For the "full participation in quality management awareness is not strong" and "ignore the appearance of the details related to the quality of project management" quality management problems of main building of mobile company in Puyang, the study use total quality management approaches to resolve, the main use of its "three-wide," the idea that the full, the entire process of comprehensive quality management strategy, through full participation, mobilize the enthusiasm of all staff, thereby increasing awareness of full participation in quality management; through the whole process and full quality management, in order to better manage the quality and attention to detail, thus better able to ensure the quality of the projects.For the "Important process is not carried out for the quantitative management "quality management problems of main building of mobile company in Puyang, this study uses QC Group approach to solve them. Through group established on selected topics, the survey situation, set goals, analyze the causes and to develop countermeasures, implementing measures, check the results, to develop measures to consolidate, summarize and next plan these activities processes, quantitative test for concrete structures, and further instructions, experience alone is not a good quality problems were found, the data should be used to speak, for the important process for quantitative management.The ultimate goals of this study is to demonstrate that Total Quality Management (TQM) and QC Group can use a combination of feasibility, and solve quality management problems of project, I hope in the future it can play an active role in the project management and provide methodological reference.
Keywords/Search Tags:Construction Projects, Quality Management and Control, Total Quality Management (TQM), QC Group
PDF Full Text Request
Related items