| The background of the subject is National "Twelfth Five-Year" Plan for Science&Technology Support-" Ensuring Housing Industrial Design and Construction Key Technology and Demonstration Research ", taking the composite wallboard as the research object, using the experiment and calculation means to solve some problems in production of the composite wallboard, aim to provide some reference for the production and development of our country’s housing components.Through the deep research of the Process s Curings Liftings Quality Acceptances Concrete Element Mending and other aspects of the composite wallboard factory production, the main achievements were summarized in detail as follows:(1) Based on the production process of research, sum up the causes of deviation deviations and allowed value; Secondly, this paper studies it deeply on the type, function, physical properties and processing of the materials used by composite wallboard; Finally, through compression and rebound experiment, establishing special rebound curve, as the reference of evaluating concrete quality.(2) This paper systematically studies the principle and technology of steam curing, obtains the influencing rule of steam curing on HPC. On the basis of the proposal of steamed raise system; At last, it puts forward actual production of steam curing existing problems, and gives the improvement measures.(3) This paper gives the knockout conditions and knockout strength testing method; Use simulation method to check the working conditions of wallboard stripper and lifting, finally gives the security value; Introduces the composite wallboard from inspections classification, to repair process and repair methods and materials.(4) This paper introduces the composite wallboard storage, quality inspection, marking and transport; The paper has summarized quality inspection contents from many component factories and specifications. Finally, combined with the practical situation, this paper gives suggestions of quality inspection form, in the table, including the quality qualification requirements.(5) The main work was summarized at the end and some conclusions were made, and the future research contents were also recommended. |