Font Size: a A A

Research On Risk Management Of Dalian Power Plant Fire Hydrant Box Transformation Project

Posted on:2016-10-27Degree:MasterType:Thesis
Country:ChinaCandidate:C G XuFull Text:PDF
GTID:2272330467481516Subject:Project management
Abstract/Summary:PDF Full Text Request
With the continuous development of enterprises, security has becomea constant theme in production. The country and the enterprise also pay moreattention to safety, but with different factors such as production, workingenvironment and staffs, all kinds of accidents and injuries still occur. According tothe Personal accident assembly of the CLP Northeast company in2007-2012,4caseshappened, resulting in4people killed,2people injured,which caused huge losses tothe enterprises and people’s life and property. And in these incidents, outsourcingprojects accounted for a significant portion of proportion. Personnel securityawareness is weak; management is not standardized; responsibility for security is notimplemented; Those are the important causes of the accidents.This paper will take safety management of Dalian power generation limitedliability company fuel transport field fire hydrant box transformation project toresearch and analyze. We will ensure the safety of the construction site,throughthe risk management of the outsourcing projects, risk identification, formulatedetailed measures of safety management. Find out the other risk factors and find theweak link of outsourcing project and achieve the controllable risk and the future tofurther risk supervision effect.In production, we have done a lot on the safety aspects of the work."Riskanalysis" and "hazard identification and risk assessment" recently launched and otherspecial activities are aimed at the risk of work. But when carrying out thetwo work,"risk analysis" focuses on specified risk points, not the cause and the needto pay attention to the degree of the risk,"“hazard identification and riskassessment;" not only identifies hazards, but also assesses therisks, only to operational risk, from the start to the end of a work, only to the existingoperating analysis, and many contents can’t be used directly. The purpose of this study is to establish a set of detailed database and a complete set of process. theconstruction project can be used directly, it has a better guiding role to avoid risk.Then according to the situation and operation situation, identify the risks fromthree aspects of people, environment and operation; On the basis of risk identification,according to "the consequences, exposure and the possibility "we score it and assessthe risk level; Finally, we hand risk and supervise risk, and after the event of aproblem link emergency plan as emergency backup measures.Research on risk management of Dalian power fire box transformationprojects, will be the site of the risk according to the hazard classification recognitionand evaluation, establishing of a database, and in future work, can be useddirectly; And give us detailed descriptions of their respective responsibilities indealing with risk and treatment process. Now, according to the results of thisstudy has been part of the site construction. Be in good condition. no exceptionoccurs, the construction personnel work site safety consciousness ismore profound, understanding the field operation risk in advance. Thisstudy has certain reference meanings to the site safety management, with theapplication of high value and strong practicability.
Keywords/Search Tags:construction site, risk assessment, outsourcing engineering, safety management
PDF Full Text Request
Related items