Font Size: a A A

Pipeline Construction Site Safety Management Research Of The Crystal Hotel

Posted on:2015-02-02Degree:MasterType:Thesis
Country:ChinaCandidate:H T ZhangFull Text:PDF
GTID:2252330428956164Subject:Project management
Abstract/Summary:PDF Full Text Request
Late in our country to study the project risk management is started, comparedwith western developed countries, there is a certain distance. Under the plannedeconomy system, the lack of risk management awareness and management ability.With the market economic system continuously improved, gradually understanding ofproject risk, produced change the previous project risk losses are borne by thegovernment idea, launched the "who investment, who the decision-making, who bearthe responsibility and the risk" principle, the real implementation of the "governmentguidance, social participation, market operation" operation methods.Project risk management has been widely used in the construction andinstallation of construction project. Especially in recent years, building constructionaccident rate and the number of casualties after road traffic and coal mining industry,has become the third largest source of high accident. China is the world’s largestindustry labor groups, but their labor safety and environment condition is a bigproblem, construction and installation of construction production safety situation isgrim. Because the construction and installation of production with disposable,complexity, high operation, labor intensiveness, therefore has been a high-riskindustries, safety accidents in construction field of building installation occurredfrequently, the high number of casualties, but the incidence and the death toll is risingyear by year, caused huge losses to the state, the people’s life and property.This paper will take the Crystal Hotel pipeline reconstruction project as a casestudy and analysis of the safety management of construction site. The safety riskidentification on the Crystal Hotel pipeline reconstruction project, evaluation and riskmanagement, to find out the potential dangerous and harmful factors of the projectinstallation and construction of the production process, especially to find out thedangerous neglected factor unexpected and occupation hazards. The weakness in therecognition system and may lead to the occurrence of accidents and occupation hazard conditions, according to the process and conditions, proposes thecorresponding countermeasure. Prevention, control of accidents and occupationhazards, as much as possible, even if the wrong operation or equipment failure, riskfactors are also not lead to accidents and occupation hazards, realize intrinsic safetyproduction process. For not completely eliminate dangerous situations, in the safetyevaluation, but also the main risk further some of the consequences of the seriousfactors and occupation hazard analysis methods of quantitative, possibility andseverity of consequences forecast accidents and occupation hazards, and formulatedto reduce and control measures of accident consequences spread, and eventually thewhole process, a full range of safe production control.In this context, the safety management of Crystal Hotel pipeline reconstructionproject construction site can provide the basis for the safety of construction plan ofthe project; to provide the basis for the construction project risk management; providea basis for the project to develop the emergency incident.In the process of this study, the comprehensive use of economics, managementtheory and systems engineering and analysis methods, especially in the field ofproject management on project planning and control, project risk management, andenterprise management principle and management methods, adhere to thecombination of qualitative analysis and quantitative analysis, theory and applicationresearch, and through the analysis of actual cases. Mainly to solve the following threeaspects: first, identify the installation of construction site safety risk. Including theinstallation and construction of data collection, present situation to estimate the safetyrisk, risk identification techniques and tools, safety risk identification results.Evaluation of second, installation and construction site safety risk. Based on theprinciples and methods of safety risk assessment of the construction site, the specificcharacteristics of the actual construction site safety risk analysis of the project andobjective evaluation. Study on all phases of the project’s overall risk, the risk ofinteraction, interaction and on the overall impact on the project. Third, control ofconstruction site safety risk. To carry out the construction measures of safety controlfield, including the construction site safety management of the project guarantee system, the control measures of security risk, and put forward the emergency safetymanagement of construction site.
Keywords/Search Tags:Project risk management, Risk identification, Risk assessment, Risk control
PDF Full Text Request
Related items