Research On The Management Of Schedule Optimization In Construction Stage Of Construction Project

Posted on:2015-02-05Degree:MasterType:Thesis
Country:ChinaCandidate:L YuFull Text:PDF
GTID:2272330461964412Subject:Project management
Abstract/Summary:PDF Full Text Request
Now, as the telling of the country’s economic and social development, the construction industry has been rapid development. But the current construction schedule management are still widely used traditional methods, the lack of the concept of scientific and reasonable, the progress of the control system is not adjusted with the change of the enterprise strategic layout. Project progress control level is directly related to the benefit of the construction unit and the cost control level, to meet your project progress control objectives need to establish an effective control system to guarantee, reliable measures, cultivate conforms to the project actual project culture, in order to improve the management of execution. Construction progress control of construction project, therefore, to explore and research, no matter for the construction unit or the construction unit, all has the very vital significance.On this basis, the first systematic exposition of the progress of civil construction project management research status at home and abroad and the related basic theoretical knowledge, then to Chongqing Lifan Center project, for example, combines project management software, Microsoft Project 2010 prepared a project schedule and draw a Gantt chart and network diagrams.On this basis, the analysis of its existence in the progress management issues and problems are analyzed and the corresponding proposed solutions, to optimize the implementation schedule, and established a schedule management and organization system.Finally, the use of network technology to the construction of the project to establish a system and 4D BIM schedule management, timely tracking and monitoring the actual progress of the project implementation process, to achieve dynamic management of the project.This article has distinctive for the line, a strong research value operability and practical applications. Therefore, a better understanding of the people associated with the project schedule management, knowledge, guidance in the related work of staff, has great reference value and significance.
Keywords/Search Tags:The construction industry, Civil construction, project Management, Schedule management, schedule control
PDF Full Text Request
Related items