Research On Construction Schedule Management In A8 Zhong Wan Highway Project

Posted on:2015-01-30Degree:MasterType:Thesis
Country:ChinaCandidate:Y J HuangFull Text:PDF
GTID:2272330461496750Subject:Business administration
Abstract/Summary:PDF Full Text Request
In recent years, with the development of social economy and the improvement of people’s living standard, the demand of expressway is becoming greater and greater, and the construction of highway project has been developed rapidly. At the same time, the uncertain factors that the construction projects facing are becoming more and more, and the relationship among those factors is more complex, which increased the difficulty of construction. Therefore, to carry out planned management is very necessary for the whole project construction.Highway construction is a project which involves large scale of investment, long period of construction and many units. There’re many factors that affect the construction schedule. So we need to manage the construction schedule, allocate resources reasonably and coordinate all the participating units, in order to ensure the realization of the goal of project management. The progress of the project management is a complex process. We need to use the scientific method to prepare the plan of project construction, then put it into practice. In the construction process of the project, we should track actual progress to check project whether in accordance with the original plan or not. If there exists differences, we must analyze the reasons of those differences. Then we need to make adjustment of the original plan until the completion of the whole project.In this paper, based on a large number of domestic and foreign relevant project construction schedule management literature, defines the concept of project construction schedule management, analyzes of the characteristics of highway project construction schedule management, and introduces the concept of project construction schedule target, discusses human, technical, engineering materials and equipment, cost, natural environment, social environment and other factors on the highway project construction schedule management by objectives influence. Then, introduces the construction management status of Zhong Wan highway A8 project schedule, clear goal of construction project management, and after analyzing the specific situation of the project construction schedule planning and implementation, put forward the improvement project construction schedule management and the corresponding control measures, to ensure that the project can be completed smoothly, to a certain degree construction schedule management of highway project provides reference opinions.
Keywords/Search Tags:highway project, project management, Construction schedule management
PDF Full Text Request
Related items