Font Size: a A A

Research On Risk Control Of Central Heating Project

Posted on:2014-03-27Degree:MasterType:Thesis
Country:ChinaCandidate:G LiFull Text:PDF
GTID:2272330452462638Subject:Safety engineering
Abstract/Summary:PDF Full Text Request
With rising energy prices and the growing awareness of the social and environmentalmaximize the full use of energy and to reduce emissions of the pollutants become the trend ofthe development of energy conservation, improve the quality of the urban environment, whileat the same time safeguard the continuous improvement of people’s quality of lifecentralheating works to become an important part of urban development and living, to do a good jobof central heating project risk control is necessary to protect the normal operation conditions,central heating project risk control is mainly reflected in the boiler and its ancillary equipmentand facilities(hereinafter referred to) the security control of the boiler, the boiler accident maylead to serious consequences, boiler accident or cause loss, are among the best in the kinds ofaccidents, regardless of the number of accidents. Influencing factors analysis of boilerrunaway heating boilers risk evaluation of the status quo, and the reasons for the failure ofboiler equipment, common central heating boiler types of accidents and preventive measures.Human error factors in the central heating system through the analysis of the fault treeanalysis, human factors precautions. According to the analysis, by studying heating boilersdangerous, toxic factors the boiler safety evaluation analysis, an important factor to solve theof equipment constraints boiler accident. Actual cents River district heating, central heatingworks decomposition, analysis of specific factors that may cause the boiler accident, ancillaryboiler equipment, boiler self-test technology, personnel training and other aspects of theconcentrate for thermal engineering specific risk prevention measures, for cents Rivercentralized heating Engineering----the boiler renovation project process the specialrequirements of cents River central heating project----boiler risks and precautions devoted to.Recommendations to strengthen the management of human factors, to achieve the purpose ofthe system to control the boiler risk.
Keywords/Search Tags:Central heating, Harmful factors, Boiler, Risk control
PDF Full Text Request
Related items