Font Size: a A A

Tiebei District Heating Boiler With A Newthermoelectric Plant Networking Project

Posted on:2016-12-03Degree:MasterType:Thesis
Country:ChinaCandidate:G WangFull Text:PDF
GTID:2272330461980479Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Changchun City Central existing large heating area, heating area of existing Southern Railway area only within the scope of Changchun thermoelectric plant heating has reached 10 million square meters, among which only about 5 million square meters to achieve a thermoelectric heat generation, and the rest more than 500 ten thousand square meters are still dispersed in 220 small boiler room heating. Tiebei existing heating area 4.3 million square meters(including the original steam heating plants), of which only 2.3 million square meters to achieve a cogeneration heating, the remaining two million square meters still dispersed 78 small heating boiler room. This part of the small boiler room widespread mismanagement, large area, low thermal efficiency, environmental pollution and other issues.Changchun City from urban master planning, heating plan, the northern part of the city of Changchun broad space for development, a sharp increase in heating, electricity and other needs. The requirements of the development trend of the northern municipal infrastructure to provide strong support to the region. Construction of thermal power plant in the northern city of Changchun, as the basis for one of the major municipal facilities, can solve the downtown area and the northern part of the old industrial bases in the development and shantytowns hot demand, but also solve the heat demand with exports of neighboring land north of the city, but can also improve air quality in northern areas. According to the development direction of the City Master Plan proposed in Changchun, in the northern part of the construction of thermal power plants downwind to reduce the environmental impact on the city, the northern part of the boiler room to the pollution of the environment. According to the requirements of Changchun city heating special program, canceled the city scattered small boiler room within a few years, centralized heating.The construction of the project to expand the heating capacity Tiebei region achieve Changchun City Master Plan and heating plan, to conserve resources, reduce emissions, improve environmental quality and quality of life of residents, with significant social, economic and environmental benefits, for sustainable development in Changchun is absolutely necessary.This paper Tiebei district heating boiler room design and construction, to provide a theoretical basis for the heating network project.
Keywords/Search Tags:Central heating, Energy saving, Peaking boiler room, Hydraulic Calculation, Thermal load
PDF Full Text Request
Related items