Font Size: a A A

Quality Management Of EPC Mode Municipal Project In Beijing

Posted on:2015-10-14Degree:MasterType:Thesis
Country:ChinaCandidate:W W ZhangFull Text:PDF
GTID:2272330431466293Subject:Project management
Abstract/Summary:PDF Full Text Request
With economic development, more and more people flock to the city, the city municipalworks as a lifeline to ensure urban operations, are facing the peak period of development also.Due to the current municipal works mostly on the basis of the existing municipal facilitiesoptimization and improvement, a lot of new technology, new equipment, and new process arerequired, so as to reduce project construction impacts on the daily operation of the city. EPCmode relying on the technical advantages of design dominating the construction, the progressadvantages of tightly combination of each subjects and cost control advantages throughtechnical optimization, better able to address the current lack of municipal construction mode,is gradually applied in the field of project.For the particularity of guaranteeing the livelihood, the municipal project has strictquality requirements, and quality management has always been the core of the municipalproject management work. EPC mode in China is still in its early stages of development, howdoes EPC general contractor use its quality management work to ensure the final quality ofthe project meet the requirements of owner is the research direction for promoting EPC modelin municipal projects.Through in-depth understanding of EPC mode project quality management theory,analysis of domestic and international EPC project quality management current status, thisarticle describes the main quality management problems of domestic EPC mode in currentstage. And the writer takes a personally involved EPC mode gas project as analysis reference,conducts because analysis in the problems occurred in construction process, and suggestsimprovements, in order to provide a reference for EPC mode municipal project qualitymanagement in the future.
Keywords/Search Tags:EPC Mode, Municipal Project, Quality Management
PDF Full Text Request
Related items