Font Size: a A A

The Performance Appraisal Methods Research Of Municipal Construction Project Management Team

Posted on:2014-03-19Degree:MasterType:Thesis
Country:ChinaCandidate:C ZhuFull Text:PDF
GTID:2272330428979098Subject:Project management
Abstract/Summary:PDF Full Text Request
The project team management is the core of project management, the successful implementation of the project management team performance appraisal is do well project team management, improve project management level, and achieve the goal of construction of the project basis and guarantee. For effective research underground municipal engineering project performance management, this article takes the Henan underground municipal engineering project the typical representative of, for example, first briefly introduces the situation of the project, and then to the project the personnel performance management present situation is discussed. Based on the project performance management and performance management present situation investigation questionnaire analysis, find out the existing problems in the project. On the analysis of project performance management based on existing problems, combined with the project management practice, the author puts forward the related performance management countermeasures.This article is not only summarized the domestic and foreign performance evaluation methods, but also focused on practical application. Moreover, this article also combined the characteristics of underground municipal engineering industry with the specific conditions of construction enterprises together to analyze the topic of performance evaluation, such as how to establish the performance evaluation system, and how to develop the performance evaluation system scientifically and effectively. In addition, in order to get a more scientific research result, this article has adopt a variety of performance evaluation theory, such as the combination of key performance indicator (KPI) in balanced scorecard (BSC) and management by objectives (MBO).In addition, the network plan in engineering project management and the PDCA cycle thought has been taken to performance evaluation implementation and management to make it be much more focused and maneuverable. Furthermore, during the research of the topic, the study has used full of the existing literature materials, a variety of research methods such as comprehensive comparison and classification, analysis and synthesis, inductive and deductive, case analysis and other research methods. Finally, as I participated in traffic construction project in the past, I have got some experiences in this area which can help me test and summarize the performance evaluation system more scientific and applicability.
Keywords/Search Tags:Underground municipal engineering, Projects, Management team, Performance evaluation
PDF Full Text Request
Related items