Indexes, Methods And Strategies To The Post-assessment Of Public Hydraulic Engineering Projects At Yiyang City

Posted on:2014-04-25Degree:MasterType:Thesis
Country:ChinaCandidate:Z F TangFull Text:PDF
GTID:2272330422474154Subject:Public Management
Abstract/Summary:PDF Full Text Request
Project Post-evaluation plays a critical role in summing up sueeess and failureexperiences of the management and improving the seientific level of deeision-making.Post-evaluation of investment projects is increasingly emphasized by various domesticindustries. Since the entrance into21stcentury, with the transformation of governmentfunctions and marketization reform, there are many contradictions in water conservancyconstruction currently. The traditional management system of water project constructionin a planned economy is changing, especially the public hydraulic engineering projectswhich need to meet the higher requirements made by the nation and all levels of society.In order to improve continuously the decision-making and management level of publichydraulic engineering projects, we have to pay much attention to the importance of thepost project evaluation, strength continuously the research on the relevant theories andmethods.The main contents include:(1) Related concepts and theories: the definition, contents and characteristics ofpublic hydraulic engineering projects; the contents, methods, features and significanceof post project evaluation for water conservancy projects; the concept and contents ofwater project management and maintenance.(2) Indexes and approaches of post evaluation for public hydraulic engineeringprojects: the principles for establishing indexes; evaluation indexes and methods.(3) Examples of post evaluation for public hydraulic engineering projects atYiyang city: the evaluation indexes for five types of public hydraulic engineeringprojects; the weights of indexes obtained by Super Decision software; the evaluationprocess and results. And the results proved the feasibility and efficiency of postevaluation.(4) The countermeasures and suggestions to the post evaluation for publichydraulic engineering projects. For example, constructe a scientific and effective postproject evaluation process, establish a non-dependent post project evaluationorganization, design the feedback mechanism for post evaluations, and implement thesafeguard measures to post evaluations.
Keywords/Search Tags:public hydraulic engineering project, post evaluation, index, countermeasure
PDF Full Text Request
Related items