Font Size: a A A

The Exploring Of Post-evaluation Of Construction Project In Medium And Small-scale Water Conservancy And The Hydroelectric Project

Posted on:2006-03-26Degree:MasterType:Thesis
Country:ChinaCandidate:H D WangFull Text:PDF
GTID:2132360185993459Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
At present, after the project is completed, a lot of the water conservation and electricity construction enterprise can carry on simple construction summary through completing the form of summarizing, completing the report too and review the success and failure of project construction. But these are limited, one-sided, not systematic, don't have unified parameter of technical and economic index and unified content required and so on., the construction summary is compiled all by or mainly by the person who participate engineering project construction, it is difficult to form objective just appraisal, it has not form the unification standard form to provide writing material for the enterprise high level leader doing policy-making reference. In view of the above state, I think the construction enterprise at present stage, especially large-and-middle-scale water conservancy and power construction enterprise should adopt engineering project construction post-evaluation replace shallow construction summary to analyze appraising and objective summary, which is beneficial to improving insufficient and developing the advantage of enterprises, to improving the management levels of enterprises , raising technological economic rationality of enterprise bid and enhancing the market competitive ability of enterprise.At the present stage, the construction post-evaluation of the engineering project has not been seen detailed reports yet both at home and abroad, there is a small amount of some project construction post-evaluation, which belongs to summing-up articles, about the research achievement of this is rare as soon as sees. The research of this topic has innovative and groping character. But seeing the fact that project construction post-evaluation range is too wide , evaluation index system is various , personal knowledge surface is limited, and construction materials collection is difficult, so this paper dwindle range, project that studied limit in medium and small-scale water conservancy hydroelectric project field, which as a break-through point of the construction post-evaluation of the project.This subject regards synthetical post-evaluation of construction project of medium and...
Keywords/Search Tags:Engineering project, Post-evaluation, Success Index weight, Degree of membership
PDF Full Text Request
Related items