Font Size: a A A

The Evaluation Research Of The Information System Hardware Construction Program Of GK-company Based On AHP

Posted on:2014-11-24Degree:MasterType:Thesis
Country:ChinaCandidate:S Z TanFull Text:PDF
GTID:2268330425476768Subject:Project management
Abstract/Summary:PDF Full Text Request
With the economic development and technological progress of information technology inthe enterprise competition more and more important, smart business decision makers moreand more attention to the construction of information systems. Hardware construction as thebasis of the information system, the ability of the enterprise information construction smoothand successful implementation, plays a key role; prior to commencing construction of thehardware, select a suitable hardware building programs, but also a very worthy of attentionlink. GK-companies are faced with the problem of information system hardware selectiondecision-building programsEvery business has its own unique personality, how to select the information systemhardware construction program for your company? The best way is to establish an evaluationindex system, a comprehensive evaluation and comparison building programs of the candidate,and then according to the results of the evaluation, make the most appropriate options. Itseems from our literature for the Evaluation of Information Systems or forecast, prediction orevaluation of the information system hardware construction projects. Based on thisbackground, this paper first attempts to determine the hardware construction evaluation indexsystem based on the characteristics of the information system hardware construction, designprinciples, selected as the content and scope of the evaluation; establishment of evaluationindex system and structure and then use the Analytic Hierarchy Process (AHP) model,judgment matrix and calculate each index factor weights matrix consistency test, so as toobtain the weights of evaluation indexes system, as objective as possible and reasonableevaluation index system and perfect, and the quantitative results of the evaluation moreobjective and accurate.Evaluation index system is established, and the company’s information systems GKexample hardware construction program evaluation, according to the real data from the actualwork of the experts conducted a questionnaire survey and analysis of the results, the companyestablished the GK four candidate information system hardware construction programcorresponding to each evaluation index weight order and eventually got four candidate totalweight for GK company’s information system hardware construction to provide a basis forprogram selection and is similar to the construction of enterprise information systemshardware to provide reference; rather by example verification, also shows that the evaluationsystem and analytical methods meet the actual requirements.
Keywords/Search Tags:Information Systems, Hardware construction, Evaluation System, AHP
PDF Full Text Request
Related items