Font Size: a A A

Nanning Television Monitoring And Control System Project Management Research

Posted on:2014-10-27Degree:MasterType:Thesis
Country:ChinaCandidate:P C JiangFull Text:PDF
GTID:2268330401986251Subject:Project management
Abstract/Summary:PDF Full Text Request
With the extensive use of digital technology, information technology, high availability, high reliability, and maintainability requirements also become more prominent. Build a safe, stable, state-of-the-art emergency response capacity and broadcast functions, expansion capability, and error detection capabilities, error correction capability, backup measures, easy to operate, convenient maintenance monitoring system for quality fully grasp the security and management of radio and television broadcast the case provides good protection has become an important task of the broadcast television industry has a very important significance for broadcasters. In this case, the use of the equipment involved in the the auxiliary signal monitoring and control system has become an inevitable means.Currently, a set of construction of Nanning television plan based the Nanning television signal monitoring in Taiwan and monitoring system, if the smooth and successful running will provide a useful reference to optimize the transformation of the system of monitoring and control of other brothers television.Nanning television system for monitoring the project construction, build analysis carried out in-depth research and analysis point to demand business process analysis and then to the overall architecture, combined with their own experience and research practice, detailed design of the monitoring and control system Nanning TV the overall project management, from project planning to implementation and control of the whole process of project construction and management of the program, the management program throughout the entire project construction process in the system through the project to build a specific time and the implementation of the quality management approach and implementation of programs, specific construction details are finalized to the fine division of labor, in order to ensure that the project on time, according to quality.
Keywords/Search Tags:system monitoring, project management, overall projectmanagement
PDF Full Text Request
Related items