Font Size: a A A

Employee Assistance Program (EAP) System Research And Realization

Posted on:2014-06-13Degree:MasterType:Thesis
Country:ChinaCandidate:K LiFull Text:PDF
GTID:2268330401464601Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Along with the basis and the high speed development of economy, civil aviationalso advance by leaps and bounds, HangBanLiang grows day by day, atc servicesecurity on the dependence of the atc equipment, strong of atc equipment to ensureflight safety degree is high, the atc equipment the risk of continued operation, therefore,strengthen the atc equipment to ensure and improve the ability of the atc automationequipment investment management is important, the equipment investment is tostimulate the civil aviation activities in southwest atc realize the leaping developmentpower, is form international atc the cornerstone of the core competitive ability, civilaviation southwest air traffic the board of the investment project management at presentinformation level is low, the impact on the development of the southwest KongGuanJu,for civil aviation in southwest KongGuanJu, through the informatization construction,will greatly enhance the work of civil aviation southwest KongGuanJu effect, also willgreatly promote the standardization of management, production operationmodernization.In this paper KongGuanJu southwest informationalization construction of thepresent situation, proposed the centralized investment project management informationsystem framework pattern, southwest KongGuanJu project investment managementprocess as a basis, to carry on the summary, to point out the investment projectmanagement requirements, design develop investment project management system(IPMS). The system is a part of the atc ERP project, planning scheme business theinformation construction will achieve in ERP financial, used the assets of the series,module. Establish\"investment project management system\", through the system ofproject application, project examination and approval, plan issued and schedule tracking,form the assets. The system’s overall design is based on security production demandorientation, open to declare means let demand units can always project on thedeclaration, audit and project cycle will be the demand of itself and operability hook, inthe annual plan, years will mature project adjustment in the annual investment scale,targeted the extension of the company key strategies the early stages of the project demonstrates space to investment management process fine degree, realize theprospective and accuracy in planning projects on goal.
Keywords/Search Tags:Informatization construction, Fine investment management, Security
PDF Full Text Request
Related items