Along with the rapid development of China’s growing economy, social progress, at the new stage, construction areas, especially the commercial real estate, have vigorously developed. It faces unprecedented opportunities and challenges. HMJ project is a collection of commercial and residential as an integrated building group. The total construction area is93312square meters; total investment is205million Yuan. The project involves the commercial investment and residence, including main construction, decoration, weak current, etc., which is very complex, and the construction period is very tight. The schedule and controlling have certain difficulty. Therefore, it is necessary to use scientific theories and methods to control and study the project reasonably, providing a reference basis for the commercial real estate project afterwards.Based on this background, this thesis studies the research of the project management theory and studies, and analyzes HMJ project schedule and control research, and specifically controls the actual problems occurred in the construction, in order to ensure the project schedule and cost meet expected goals.This thesis is mainly divided into six parts:the first part introduces the background and significance of the selected topic, and design research contents, methods and ideas. The second part introduces the theory and method of project progress plan and control, systematically understanding the tools and methods of the progress plan and control. Then the project’s specific situation is introduced, and then the detailed project scheduling, construction plan management condition and problems during implementation are put forward. Then there is analysis according to the actual schedule and plan, and the discussion about factors affecting the schedule during the project encountered in the specific implementation, to analyze and propose solution, to control and optimize the progress, in order to ensure progress expiration of time limit meet for project requirements. The Thesis finally proposes effective protection measurement on schedule, making a summary and outlook, and put forward reference related projects.
Keywords/Search Tags:Project Management, Schedule Plan, Schedule Control, Real Estate
PDF Full Text Request
Related items