Font Size: a A A

A Company Mg Multi-biding Construction Project Emergency Rescue And Pre-Arranged Planiing Research

Posted on:2015-01-29Degree:MasterType:Thesis
Country:ChinaCandidate:G W YiFull Text:PDF
GTID:2252330428478788Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, a variety of unconventional emergencies occur more frequently showing, sphere of influence is growing, becoming more deeply affected, disaster consequences worsening trend. Emergency management is for emergency warning, control, and the whole process including institutional arrangements and other activities of management activities. As with conventional emergency disaster events, compared with explosive, severity, complexity, time constraints and other characteristics, using conventional methods can not effectively deal with. Therefore, before the official launch of construction activity, to predict in advance for emergencies and make a plan management theory and practice is increasingly becoming the focus of management.Research articles based on the construction project tenders MG emergency management. Article first chapter introduces the topics in accordance with the present study, the significance of the emergency management of domestic and foreign research results were systematically combing, and content of this study made a brief introduction; second chapter introduces the theoretical part, The meaning of the emergency rescue, characteristics, classification, emergency rescue mode and influencing factors were introduced; chapter describes the project background and current situation. This section first made a presentation on the project background, the project team was established and clearly the responsibilities of rescue teams and emergency management procedures, Bin characteristics of the Project and implementation difficulties are summarized; fourth chapter of construction may occur suddenly Send event prediction section. To avoid omissions, this research task decomposition manner MG tenders construction phase of the project engineering activities in accordance with a detailed break down, and the organization of expert group based on qualitative and quantitative evaluation methods in the construction activities emergencies that may arise to identify and review; fifth chapter of the evaluation results for the fourth chapter of contingency plans; finally made a summary of the research and prospects.MG carried out in this construction project tenders emergency management research, prevention MG tenders for construction projects sudden accidents, improve the timeliness of post-management, effectiveness, with some reference. In addition, this study of identification methods and plans for emergency management, emergency management for construction projects have a certain significance.
Keywords/Search Tags:work breakdown structure (WBS), emergency, emergency rescue, contingency plans
PDF Full Text Request
Related items