| Expressway construction project has involved in personnel, organization andcoordination difficulties, complex contract files and so on, which brings great difficulties tothe project management. Good management not only reduces project risk and reduce thesafety, quality, and better able to promote the development of projects, reducing project costs.This to Guangdong Xiang Highway paragraph engineering for relying on, in-depthparticipation has from project early prepared to completed acceptance, work, in check outliterature information of based Shang, full using systems engineering theory, and dynamicmanagement theory, and fuzzy mathematics, theory knowledge, and combined existingtechnology application level, analysis has project of process and effect factors, made hashighway project construction dynamic information of management mode. To dynamic ofangle established has dynamic management mechanism, respectively from dynamic track andoversight, and dynamic communication and coordination and incentive and training three aaspects be research, from system Shang guarantee project dynamic management of effectivefor; in project management means Shang, created has project wireless network regional, toproject information management platform for Exchange platform, through network signal,and frequency shot signal will computer, and phone, and CCTV monitoring system, andmobile equipment, connection up, to contact everyone, and collaborative each Office, andmonitoring each construction scene. Project personnel in accordance with its access to theplatform, to their own tasks and projects in a timely manner dynamics, rationalization ofmanagers based on their own information analysis and evaluation, efficiency analysis,economic analysis and cost control of engineering so that reasonable adjustment. |