Font Size: a A A

Resreach On Command Attemper In Prouduce Of Golden Belt Refinery

Posted on:2015-02-08Degree:MasterType:Thesis
Country:ChinaCandidate:F LinFull Text:PDF
GTID:2251330428456118Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The oil refiner is the national development strategic pillar industry in the petroleumchemical industry’s upper. Its role is to value relatively low crude oil into gasoline, diesel,kerosene, petroleum products, lubricating oil and other high benefit. In the background ofeconomic globalization, Oil companies all over the world gradually to snatch market share inthe world. Petrochemical enterprises has gradually from the seller to the purchaser roletransformation, thus forming a new pattern of economy for petrochemical industry, refineryin the new pattern, reduce the cost of operation optimization, has become the majorchallenge of revenue.Production command dispatch system is the bridge between the refinery decision planlayer and production operation workshop process control layer, is the link of refineryinformation integration. Oil production dispatching system is optimized through the wholeprocess of the production process, to assist the refinery to form a closed loop productionsound, also provides a perfect real-time decision data and production data for the leadershipof the management and decision making. Because of the production process in a refinery is alot of uncertainty, so that the management plan and actual production often disjointed, causeeffect of application of management information system is not ideal, the development andapplication of production dispatching system to effectively solve this problem. This paperfirst analyzes the development status of domestic and international information, according tothe research of production dispatching system, the research status of the system at home andabroad today, contrast, analysis.Combined with the actual situation of the gold beltproduction scheduling in refinery, the establishment of the system put into use to makedetailed feasibility analysis. The overall design of the system is feasible for the constructionof the refinery production scheduling system information. The implementation of lists theimplementation plan and detailed costing of construction production dispatch system. At theend of the paper, but also for future gold belt production scheduling system is summarizedand the development prospects of the refinery.With the construction of investing with production control system of refinery by gold,will reduce the production cost, shorten production cycle, improve the productivity ofequipment. By reducing management costs, production costs, reduce inventory20-30%, the product cost can be reduced to10%-20%, shorten the product development cycle, accelerateproduct production. At the same time, improve the quality of products and services, toexpand market share. The production control system, with the modernization, informationmeans to improve the management level of enterprises, improve the ability of research anddevelopment and production of products, increase the enterprise production flexibility,reduce time to market, improve the quality of products and services, increase customersatisfaction, improve market share.I hope this paper can help and reference for the construction of our factory productioncontrol system.
Keywords/Search Tags:Production command dispatch system, Omotion of information technology, Finery
PDF Full Text Request
Related items