Font Size: a A A

Import Gvdp Procedure, Build Enterprise Quality Core Competitiveness

Posted on:2013-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y ShenFull Text:PDF
GTID:2249330395950072Subject:Project management
Abstract/Summary:PDF Full Text Request
In today’s economic globalization competition, quality competition ability more and more enterprises by the attention, The enterprise build the quality as their core competitiveness so that they can deal with the complex challenges and solve the problem of sustainable development.In this paper, based on the theory of core competence, Shanghai Diesel Engine Company (SDEC) analysis the external environment, SDEC must build their own core competitiveness to win more in the market. Competitiveness is inseparable from the play of the advantage. SDEC located in the geographical advantages of Shanghai, with long history and technology accumulation. At the same time SDEC will get powerful support after join the Shanghai Automotive Group.SDEC will get more resources to build quality core competitiveness.Based on the quality management in domestic and foreign development, from the actually quality management of SDEC, involve the product planning background and quality management based on the analysis of present situation, SDEC must create the core competence of quality urgently to solve two major problems. First problem is new product’s unstable quality. Second one is band quality of purchasing parts.A comprehensive analyze the root cause of the problems, put forward to import GVDP global vehicle development process, establish the main flow for new product development. Based on the mainstream development process, build the quality prevention and timely control process, in order to get an effective quality prevention system and solve quality problems completely.Through by practice, SDEC find VDP processes enhance their quality management level. Help SDEC build the competition ability for different market. Finally, SDEC will meet their quality target.
Keywords/Search Tags:Core competitiveness, Quality improvement, GVDP process, Simultaneous engineering
PDF Full Text Request
Related items