Font Size: a A A

Yingkou Power Plant Phase Ⅱ Expansion Project Investment Control Research

Posted on:2014-02-05Degree:MasterType:Thesis
Country:ChinaCandidate:Z W ZhouFull Text:PDF
GTID:2249330395494863Subject:Project management
Abstract/Summary:PDF Full Text Request
Power engineering control and management of the investment is an importantpart of the capital investment management. In recent years, the development ofelectric power construction quickly, effectively promoted the development of thenational economy. Same time, due to various reasons, the power project cost roserapidly, so that the high infrastructure investment in fixed assets unit level of projectcost, the project is put into production, fixed assets depreciation charges high amountof interest, repayment of bank loans to increase production costs and reduce profitmargins, lower investment returns, the burden on enterprises, which will greatlyaffect the healthy development of the electric power construction. Power EngineeringCost issues directly related to the overall efficiency of state investment return andelectricity companies, which must attach great importance to the strict control of thepower project cost.Yingkou Power Plant Phase II expansion project construction2X330MWsubcritical coal-fired heating unit, the site is located in Liaoning (Yingkou) CoastalIndustrial Base, the site has been included in the the Yingkou City cogenerationoverall planning and has been determined. Accordance with the overall planning ofthe CHP, the project will Yingkou Coastal Industrial Base to provide heating heatsource and industrial steam. Similar domestic power project cost management andcontrol from the start, and reveals the power of project cost control is a systematicproject, Yingkou Power Plant Phase II Expansion Project of the actual situation, thewhole process of a full range of management and control demonstration. Each stageof the project investment control main content: investment control of the investmentanalysis and control of the project the decision feasibility study stage the projectdesign phase, the project construction, supervision and commissioning phase of thebidding and contract management, project construction phase of the construction unit construction units and supervision units to do their work duties, project completionand acceptance stage good investment control of the completion of settlement, projectaudit and claims. After each stage, in-depth analysis of research, to identify the keyfactors that affect electricity project cost based on how to strengthen the managementand control of the project investment, to truly achieve effective control of projectcost.Yingkou Power Plant to two2X330MW expansion project starts soon, goodinfrastructure project cost management is a priority, this article from reality, theorywith practice, based on the current conditions and Yingkou environmentalcharacteristics of the region, the phenomenon of investment in the field of powerengineering construction cost overruns, settlement over budget described. YingkouPower Plant Phase II Expansion Project site, the engineering overruns reasons, theanalysis of how well the project investment control effective party method and means.I hope this article will be able to provide a reference for Yingkou Power Plant PhaseII project investment control.
Keywords/Search Tags:The Engineering Extension, investment, management research
PDF Full Text Request
Related items