Font Size: a A A

Design And Implementation Of Wahaha Company’s Financial And Cost Control System

Posted on:2014-01-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2248330398950908Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Cost as a generalized value category, generally exists in market economy, various industries and fields. With the increasingly fierce market competition, raw materials and labor rise ceaselessly, the manufacturing enterprises to improve economic efficiency, Pay more attention to how to reduce costs. While the rapid development of information technology, ERP system started to receive the widespread attention, and in the enterprise management has played a more and more important role.The research background Wahaha Company’s SAP/ERP project implementation, the enterprise ERP software to re-establish a set of Wahaha Company features financial and cost control mode, hoping to replace the original backward costing. In this context, The study’s primary method comprising:(1) Establish the standard cost method as the main costing methods, cost targets developed through the establishment of a standard cost, standard cost for subsequent cost analysis to provide a reference.(2) Overall system design, database, business process design, to identify irrational place to improve existing processes, re-design a more efficient and new processes to meet the needs of daily production and business activities. ARIS modeling method, the modeling results are reflected business blueprint, It is the basis for the implementation of the SAP/ERP system.(3) System, defining the architecture of the SAP/ERP system, Different functions of the client installation on multiple servers, From the system configuration, self-development, testing, until the official use, Use the full set of implementation process.(4) ASAP, accelerated implementation methodology introduced...
Keywords/Search Tags:Financial and cost control, System Design, Project Implementation
PDF Full Text Request
Related items