Font Size: a A A

Third-party Establish Schedule Early-Warning System Based On Information Platform

Posted on:2012-03-08Degree:MasterType:Thesis
Country:ChinaCandidate:B LiuFull Text:PDF
GTID:2248330395488859Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
Schedule control is an important work of supervision engineer, on the one hand, engineering duly or finished ahead of time can not only play the use function as soon as possible, reflect the benefit of investment, the more will bring better social benefits. On the other hand,Supervision engineer progress control is different from the construction unit and the construction units schedule control,irreplaceable, but according to statistics,at present.the effect of progress control in the project schedule delays more, investigate its reason, main is lack of effective control method, the original control means lag behind. That is to say, although supervision system gradually perfect, but supervision engineer not form a new schedule control mode, no effective schedule control method, still stay in original basis, failed to innovationThis paper proposed progress warning system based on information platform, tried to make it a supervision engineer schedule control "tool", become effective control method, applied to practical engineering, play auxiliary supervision engineer control progress function, create value.This system is based on the use of the computer technology, the net work technology, the communication technology established infomation platform.this paper studies the information platform of significance, principles and composition. Information platform, optimize the information processing information transmission and realized in time for progress warning issued by function, and schedule control provides the basis, and promote the process of third party progress management informationization. Information platform by information collection system, database and LAN composition.Based on the information platform established warning system including warning analysis and warning countermeasures. including two sub-systems, warning analysis subsystem is for information platform of information collection, storage by fuzzy comprehensive evaluation method to evaluate progress through the analysis and quantitative risk factors, the project supervisor has fully grasp the probability of various potential risk factors and schedule delay degree, accordingly, the expert meeting shall be convened supervisory engineer. according to the evaluation results predicted risk factors, and according to the schedule delays on acoustic alarm; Warning countermeasures should include regular subsystem inside risk factors and emergent countermeasures system risk emergency countermeasures system. And will warning countermeasures countermeasures and soft countermeasures are divided into hard, respectively from the material plane and spiritual establishing countermeasure.In the end, the paper will be based on information platform established warning system applied to actual supervision in the rich industrial projects, Obama in ensuring quality, safety, investment and premise, engineering, obtain very amiable completed ahead of success...
Keywords/Search Tags:Supervision, Schedule control, Information platform, Warning
PDF Full Text Request
Related items