Font Size: a A A

Pcf Design And Implementation Based On Baan System

Posted on:2013-08-24Degree:MasterType:Thesis
Country:ChinaCandidate:H B TangFull Text:PDF
GTID:2248330395459418Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the growing competition for market, clients apply more and more personalizeddemand. The enterprise not only gradually meets the market need, but also maintains originallot sizing product efficiency on the case of meeting market demand. So generate the demandwhich can solve sales configuration,quote and sales configuration fast transform innerproduct configuration.The development platform of the system is based on BAAN system, which is a set ofplatform independence of ERP system. Through the process of the thesis practice, the thesis isnot only confirming the value of product configuration in the special industries, but alsoconfirm to achieve design and implementation of product configuration on the special ERPplatform. As ERP system itself supports BOM and Routing function, it also applies theoreticalbasis for integration of product configuration and manufacture BOM and Routing.For the better completing thesis, the thesis analyses the demand after introducingbackground and related technology of research. Demand analysis mainly analyses specificachieving function and key demand point.There are six parts for demand of function, thecontent including use case analysis, clearly achieving scale and function. On demand analysispart analyses project feasibility from two aspects of technical feasibility and operationalfeasibility, at last confirm the project feasibility. In the process of design and implementation,first analyses implemented logic, second designs model process, layout and page layoutlinkage,third writes programs which mainly implemented function point of selecting itemcode, achieve the quantity of BOM, working hours of Routing, at last compile the program.The difficulty point is modularity.The development finally achieves that product configuration model can automaticallygenerates BOM and Routing and achieves the function of automatic quote. Theimplementation changes original business model of enterprise which sales apply demand andthen pre-sales put forward solution, at last returns sales apply results for clients. The currentmodel cancel pre-sales maintain process,and pre-sales support staff transfers to maintain logic of system required. Sales directly apply quote through system and the standard isuniform. In the view of spending time, the time of pre-sales decrease from original days totens of minutes.
Keywords/Search Tags:BAAN system, PCF, 4GL, Oracle database
PDF Full Text Request
Related items