Font Size: a A A

The Design And Implementation Of Private Network For China Construction Bank Dongguan Branch

Posted on:2012-06-17Degree:MasterType:Thesis
Country:ChinaCandidate:L D LinFull Text:PDF
GTID:2248330374498944Subject:Electronics and Communications Engineering
Abstract/Summary:PDF Full Text Request
With the continuous expansion of the business in different places, many large enterprises have built up their own private network by the help of telecom operators. So they can strengthen the link between headquarters and branches, and enhance internal communication efficiency and management effectiveness. Especially banks and other large financial companies have many applications in private network. They set strict demands on private network in the security, bandwidth and capacity. Therefore telecom operators not only try to meet the customers’demand,but also take advantage of their own transmission resources.In the renovation project of the China Construction Bank(CCB) Dongguan Branch’s private network, this paper has analyzed the characteristics of the private network in different banks, and designed the private network for the CCB Dongguan Branch. This article first describes new MSTP technology and applications, then focus on the three kinds (based on the SDH, MSTP, MSAP)of network design and the comparison of them, thus contributing to providing references for the different customers in private network design and construction.According to the demand of the CCB Dongguan Branch and the advantage of own transmission resources, this paper proposed a whole MSTP network design. This paper expounded particularly the network configuration, testing and the implementation of the project, proving the scheme for the private network in the CCB Dongguan Branch reasonably practicable.In the renovation project of the CCB Dongguan Branch’s private network, I’ve been involved with customer visits, demand generation, technical talks. After the basic intention to reach, I organized the whole program in a number of networking the discussion, planning and design verification and functional testing, and follow up the network construction and implementation, to make the renovation project completed successfully.
Keywords/Search Tags:private network of bank, SDH, MSTP, MSAP
PDF Full Text Request
Related items