Font Size: a A A

Design And Implementation Of The Production Planning System Based On SAP R/3

Posted on:2013-01-02Degree:MasterType:Thesis
Country:ChinaCandidate:H ZhangFull Text:PDF
GTID:2248330371483157Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In this paper, Modern production techniques and business information into thebackground, in order to XCMG Railway Equipment Co., Ltd., the company installed SAPproject-based, SAP R/3production planning function module for the object of study.Targeted configuration and development in SAP R/3common standardized system platform,in order to meet real business needs of enterprises in the process of system implementation.This issue through the analysis of business processes, to explore the process reengineering,then presents a PP module is installed based on the XCMG Railway Equipment Co., Ltd. inSAP R3system design and realization of business models and solutions. The purpose of thesystem through the implementation of the program to lower-level integration of timely,accurate, efficient exchange and sharing of information, eliminating information silos andoptimize the supply chain, integration of resources, improve efficiency, enhance themanagement level.Overview of the main tasks of this paper the following points:First, the background, significance and status quo of the research, explain the mode ofXCMG Railway Equipment Co., Ltd. equipment management, product characteristics, thereare expected to achieve the status of problems and projects to enhance.Secondly, the system is involved in key technologies, including SAP R/3technology,the SAP of PP, the WBS production batch as well as MRP Material Requirements Planning.Given the structure model of SAP R/3on the interaction between the logic of the module,clear the WBS decomposition principle and the fundamental principles of MRP.Third, the subject needs analysis is described, describes the overall system designconcept, process framework and function modules framework. The system from theproduction planning function module system is functionally divided into six parts: theproduction of master data maintenance, the demand management process, materialrequirements planning process, the workshop production scheduling process, production andorder picking process and production orders to be completed to determine the process sixmost refined into XCMG Railway Equipment Co., Ltd. PP module design andimplementation of system functional requirements. Analysis of the composition of eachmodule, and describes the communication between modules, and interoperable.Fourth, introduced the system of the demand environment to achieve the six functionalmodules, including a detailed description and system operation and demonstration, and thenthe two parts of sub-unit testing and integration testing system testing process are discussed Development and business improvement is a gradual process of accumulation for theSAP system in XCMG Railway Equipment Co., Ltd. of the design and implementationsystem development and operations to enhance the process of a gradually accumulated theonly continuously optimize the technology platform and software framework, the standardsystem with the actual business fully running, in order to reinforce the product and businessaccumulation of basis, thereby ensuring the system stability, improve the management levelof refinement to achieve the unity and integration of the overall business purpose.At present, the SAP system in XCMG Railway Equipment Co., Ltd. equipment to run.Run effects from the point of view, through the SAP system and greatly enhance the businessnormative implementation of the coherence and efficiency, XCMG special equipment thatthe company’s employees have more time and energy to turn to higher-value analysis anddecision-making work. Practice shows that the implementation of the system is successfuland effective.
Keywords/Search Tags:SAP, PP, WBS, MRP, Master data, Work center, Process route
PDF Full Text Request
Related items