The Research On Construction Project Management Of Gong Teng-highway In BT Model

Posted on:2014-02-27Degree:MasterType:Thesis
Country:ChinaCandidate:D L YuanFull Text:PDF
GTID:2232330398976869Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
BT model as a new financing construction mode has been applied and polularized in highway construction,which has an important promoting role and practical significance in speeding up the pace of high road construction and enhancing the ability and level of transport facilities.In this paper, Gong Teng-highway BT modle is planed and analyzed through the applied research on Gong Teng-highway BT project in all domains, including Management system, Organization model, Target control and Risk management. Furthermore,some related experiences and enlightenment worth to promote are summarized in engineering practice.By the study and analysis of engineering examples, this paper gives useful conclusions and recommendations in the aspects of the highway construction BT mode,such as macroeconomic policy, operation mode selection, the whole process of organization and management, information communication of parties to the contract,etc.The paper conclusion reveals some problems and emphasis which should be focused on and grasped in practice,thus policy recommendations to improve the management of highway BT project are proposed,which provide support and protection for the promotion and application of the BT model.
Keywords/Search Tags:Gong Teng-highway, BT construction mode, Target control Riskmanagement, Management system
PDF Full Text Request
Related items