Font Size: a A A

Nsn Base Station Controller Equipment Cp Load Proactively Monitor System Design And Realization

Posted on:2012-03-11Degree:MasterType:Thesis
Country:ChinaCandidate:X Y ZhangFull Text:PDF
GTID:2218330371461015Subject:Software engineering
Abstract/Summary:PDF Full Text Request
China Mobile Communication Company is concentrating on the construction of concentrate monitoring system.In 2009 CMCC began to construct active monitoring system based on real-time performance,but many foreign companies don't provide real-time performance data to third party company by standard north interface.The subject comes from practical problems of communication companies,and we should resolve following problems:(1)How to get Nokia-Siemens BSC CP load performance data by nonstandard north interface.(2)How to transfor message data by IBM MQ message platform.(3)How to create performance alarm data by performance baseline data.
Keywords/Search Tags:active monitoring, north interface, baseline, tolerance level
PDF Full Text Request
Related items