Font Size: a A A

School Of Software Training Integrated Management System Requirements Analysis And Design

Posted on:2007-08-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y QuFull Text:PDF
GTID:2208360185983783Subject:Software engineering
Abstract/Summary:PDF Full Text Request
As one of the first group national demonstrated Software College, Shandong University Software College regards the education and development of engineering-type talent as one of 3 cores cultivate targets of the college itself. Training chain is the most important way of realization of engineering-type talents, and it is front line which known from traditional school of computer science and technology to bring forth new ideas. According to the training business, the main function of Training Management System is give entire support to the whole business. As the important part of college informationization, the development of TMS is to bring systematic support to series management of training bases, training process tracing, in-campus training resource and courses training.The lightweight Rational Unified Process (RUP) with agile characters is used as development tool; UML is used as description language for analyzing and design. And whole system used J2EE-Archetecture. The project gave entire requirement analysis and design to its 4 sub-systems, and found out a fittest way to get requirement, this way is base on modern software engineering method of problem-analysis and on multi-way of requirement enlightening.The project gave out background and meaning of project development, found out some question and shortage of most colleges by comparing other national demonstrated Software Colleges, and confirmed the characters and main tasks which need to settle by TMS. The paper described whole system briefly, gave detailed statement to requirement analysis and enlightening, architecture design, etc. For business difficulty the project designed a better tracing model of ex-campus training; at last, gave UML description to some representative instants design and implement.The main work of this project has several aspects as follows:1. Some research and implement in requirement enlightening, acquirement and develop model.Because of the tasks of software college, many business still in explored stage, so this kind of business always have high uncertainty and agility, it bring forth many difficulty to confirm or get exactly requirement. In order to resolve all these problems, this project combined the software engineering skill of requirement obtain and RUP develop model with agile ideas. In the one hand, agile model can deal with the uncertainty by a macro way, on the other hand, modern software engineering skill of requirement obtaining can give more help to some mature business by a micro way.2. The implement of mixture-structure of B/S and C/S.The maim actors is not only including managers and students, but including many bases distributing all over the country. Because of the characters of multi-actors, platform-striding and relative steady of less managers, the project adopt...
Keywords/Search Tags:training management system, agile model, requirement enlightening, mixed-architecture of B/S and C/S, management flow
PDF Full Text Request
Related items