Font Size: a A A

Research And Analysis On Fixed Assets Management System Of Yichun Vocational College

Posted on:2016-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:X H WangFull Text:PDF
GTID:2208330470954785Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the Yichun Vocational Technical College (hereinafter referred to as the continuous development of Yichun Vocational Technical College), highlights the growing importance of fixed assets management work. At the same time, the number of types of assets, asset management more and more, the increasingly high demand, more and more difficult.In2006the Ministry of finance developed "institutions fixed assets management Interim Measures" clearly requires school fixed assets management should be combined with financial management, information, fine management. However, Yichun Vocational&Technical College fixed assets management foundation is weak, consciousness, work flow is chaotic, informatization level is not high. Aiming at the existing problems of Yichun vocational and technical college assets management, business process analysis, business process reconstruction, development of fixed assets management system is very valuable, but also very meaningful.This paper first introduces the significance, research background of Yichun Vocational&Technical College fixed assets management system of Yichun vocational and technical college, and then detailed analysis of current fixed asset management process, the use of the lane drawing business process, analysis of issues in the process, on the basis of this, to business value oriented, business process reconstruction by deleting, decentralization the integration of a variety of means, etc.. The analysis of the system function and data analysis mainly from the following eight aspects:asset acquisition, asset leasing, asset maintenance, asset inventory, statistics, the large-scale equipment benefit basic data maintenance, asset retirement loss report, asset allocation. In functional analysis, the paper draws the use case diagram and write through the use case specifications to describe the system function, and gives the overall system function package diagram and package diagram of sub function; in the data analysis, the paper carries on the analysis to the realization of data of each function, established the system entity class diagram, and gives the data table structure. Finally, the paper has carried on the analysis summary of the project, and the next step for the expectation.
Keywords/Search Tags:Fixed assets management, Asset leasing, Asset maintenance, Assetinventory, Statistics
PDF Full Text Request
Related items