Font Size: a A A

Research And Analysis On Cost Management System Of Nanchang Oasis Air Conditioning Project

Posted on:2016-09-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y ChenFull Text:PDF
GTID:2208330470455412Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Nanchang Oasis Limited is responsible for large air conditioning project, involving the construction side, capital management problem of the investment side of the project process, need to cost classification process, so the workload is big, therefore puts forward the research and analysis of the requirements of cost management of air conditioning project.This article first elaborated the cost management Nanchang Oasis Limited air conditioning project background, and presents the status and research of Nanchang oasis limited the same types of research content. And then expounds the Nanchang Oasis Limited project cost is the original service, including the project basic information, investment funds into, payroll, engineering equipment purchase costs, the project maintenance, project management, project cost expenses statistics of the original business, according to the requirement of information system of the original business reengineering. In the basis of Nanchang oasis project cost, with corresponding to the given role in engineering project basic information, investment funds into, payroll, engineering equipment purchase costs, the project maintenance, project management, engineering project cost fees statistical analysis of use cases, and presents the processing flow of each case, then gives the package diagram; according to the needs analysis and functional analysis the project cost, expounds in detail the project basic information, investment funds into, payroll, engineering equipment purchase costs, the project maintenance, project management, project cost statistics of miscellaneous thumbnails, and entity attribute graph and the corresponding data structure.Through this analysis, cost management of Nanchang oasis project carried out a detailed research and analysis, which provides a reference for the future implementation of the project.
Keywords/Search Tags:Cost, The payment of wages, Engineering equipment, Projectmaintenance fee
PDF Full Text Request
Related items