Study On Design Management In EPC

Posted on:2011-08-02Degree:MasterType:Thesis
Country:ChinaCandidate:C Q ChenFull Text:PDF
GTID:2189360308458987Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
As China's construction contracting market, EPC general contractor model has become a popular international contract model, is also being vigorously promoted in China as a one contract model. In recent years, the domestic construction market, a large number of turnkey projects using EPC general contract model, but I am the domestic construction contract management level can not meet the demand for EPC turnkey projects. Construction general contracting company in China to adapt to international and domestic construction market, we must improve their level of EPC turnkey project management.EPC turnkey project management to measure the level of mainly determined by the level of design management, design management is the EPC turnkey project management of key, high-level design of EPC turnkey project management is a guarantee of success, is also a general contractor building the core competitiveness of enterprises . The current mode of the EPC Contract research are numeroushas stepped right EPC turnkey project design management, improvement of EPC turnkey project design management level is a urgent be of concern.EPC based general contracting project research status, the paper design of ECP turnkey project management process of the two-part study, part of the design and management in a narrow sense that the design of the internal management of contractors, combined with building construction procedures are described early planning stage, the design phase, procurement phase, construction stage, commissioning stage of the design and management content, design and management is discussed throughout the course of the project has always been. The other is the broad project design and management that is EPC contractor's design management and participants, this paper analyzed one by one. Based on the design and management in the process of analysis, the article they were to survey and design units for the main body of the general contractor, the construction unit to the main body of the general contractor and project management company as the main general contractor, were presented EPC project design management strategies...
Keywords/Search Tags:EPC general contracting model, design management, Strategy
PDF Full Text Request
Related items