| Along with the development of the social economy and the progress of the decoration technology, the modern project of decoration has shifted from the manual workshop to a very complicated production activity. A large project of decoration includes not only the work of production, transportation, storage and supplying, but also many temporary facilities for production and life that are needed daily in the process of decoration. The organization and coordination of these are crucial for the better and faster accomplishment of these projects.In such an era of great social and economic development, the engineering projects have taken place great changes. The management of the construction process refers the course that is carried out while managing the periodical processes and the ultimate accomplishment. It aims at the overall, final goal within a limited and specified time By adopting the most advanced ideals of project management and quality supervision, this thesis aims to seek for a satisfying method by the practice of necessary controlling measures taken during the period of designing, material buying, actual construction and post-construction period, which are the components of engineering. The design of the construction is therefore a subject which aims to research into the overall arrangement and systematic management and carry out the construction plans and requirements, and at the same time it offers the scientific arrangements upon labor source, fund, mechanic, and construction approaches. Meanwhile, it also lays emphasis on the coordination of each unit, type of work and different kinds of resources. In the entire course of construction, the most scientific, logical deployments should be made to get the relatively satisfying result.The regulation of process is by no means single-sided. It bears a close, balanced relationship with the supervision of quality, investment, information environment and the coordination of these aspects. Starting from the regulation principles of the supervision unit ,this thesis points out the method of fluctuating control and offers the comprehensive measures, organizationally, technologically, economically and contractually to ensure the effective speed control and quality management. Based on the different periods of the model-worker building, we will take effective measures to lay regulations upon them. In order to ensure the proper and normal course of the construction, the thesis makes an analysis upon the quality control of the construction, and points out the crucial points as well as the specific plans and measures, which will guarantee that everything can be accomplished in time. Basing on the different periods of the model-worker building, we will take effective measures to lay regulations upon them, especially the quality control which consists of three periods: pre-construction, on-going construction and post-construction, from which we can see the great propelling importance towards quality.To make sure that everything goes as planned; the thesis makes another overall analysis on the speed control of it. It points out the theory of all-around the emphatic regulations, which will make the systematic, the overall and whole-course regulations better and more forceful. To solve the problem of unpredictable changes of construction, the approach of speed stanzas is adopted. Namely, it aims at solving the problems that might occur during each step of construction. Thus these specified time and spot in the course of construction will help propel other projects to speed up other aspects that are not under serious control so that the regulation process can be guaranteed a fully fulfillment before the ultimate date. Therefore a series of working regulation systems should be established in which the weekly report, adjustment mechanism, precaution alarm are centered.This thesis starts from the speed and quality control and tries to dig into the subject of the general outline of the project construction in the decoration of the model-worker building. Its purpose is to search into the measures taken in the whole process and gives a brief introduction of the organizational and managing theories. Because of the significant role of quality regulation, in every single stage of construction, quality control is put into the first place. Another point is that by way of analyzing emphatically regulated part—the manifold periods of construction, many problems are solved. Therefore, a solid foundation is laid during the course of construction and many effective measures are proved to be a future principle of such projects.In the process of the decoration of the model-worker building, fluctuating work, parallel construction and quick-way method proved to get excellent results in the end, which went along with the measures of investment and quality control. By the research of supervision approaches during the course of construction, this thesis also aims to seek for a more complicated system, which, under different strata, different influences of factors, can provide a regulatory solution to give more guidance to the similar projects, which combines investment, quality and speed into an inalienable unity that are well balanced and harmonized to ensure the final outcome of satisfaction within the planned limit. Finally, this thesis tries to dig out a new effective way to carry out regulation work under any particular circumstances to guarantee the fulfillment of construction project which matches with the current economy and society. |