Ultra high voltage long-distance power transmission is a long-term strategy for State grid company, has great significance for western development and sustainable economic development in the eastern part on China. Project management on-site in Ultra high voltage long-distance power transmission is the basis of building strong grid, has far-reaching impact for establishing an effective and standardization of the transmission line project management system of state grid.Based on appearing the specific case in the Xiangjiaba-Shanghai±800 kV high voltage transmission line project management practices, using the project management theory and content to analyzing and summarizing, derived from them more suitable the model and methods for grouping management, local management, owners project department, transmission and transformation communication management system in ultra high voltage long-distance power transmission line construction. |