Search For Effective Control Of Construction Management Objective Of Poyanghu Railway Major Bridge

Posted on:2009-04-07Degree:MasterType:Thesis
Country:ChinaCandidate:L XiuFull Text:PDF
GTID:2189360245489379Subject:Project management
Abstract/Summary:PDF Full Text Request
In this dissertation, the author takes Poyanghu Railway Major Bridge as construction management study case. Based on project management's monitored control theory, discusses it that how to control personnel, operating team, cost, progress, quality, safety, environment project and risk those operation problems. The dissertation advances resolution method to realize efficiency control for project management goal of Poyanghu Railway Major Bridge.In the first, through analyses organization and project team of Poyanghu Railway Major Bridge, the author thinks it is important that to choose science mode to project organization and management. Task condition, organization demand and environment factors etc. should be considered on organization setting, personnel equipping and arrangement.In Poyanghu Railway Major Bridge project, those factors such as construction quality requirement, construction period, material, manpower, management level of technique and contract gets complicated infection on construction cost. So, project management in Poyanghu Railway Major Bridge apply responsible cost managing principle, found beforehand control mechanism and adopt windage control method to control project cost.Construction progress of Poyanghu Railway Major Bridge was affected by design, fund and climate etc. Insist on fixedness general progress goal, adjust part progress plan, adopt transverse pavement chart combined arrow diagram to monitor project progress, discover and settle problems in time.Construction quality of Poyanghu Railway Major Bridge was affected by inherency characteristic of project quality. By founding quality guarantee system, adopting quality guarantee measure to insure project quality and using cause and effect analysis method to analysis affecting factors to improve quality management level.Construction safety of Poyanghu Railway Major Bridge was affected by human, machinery, technique and environment. By founding safety guarantee system, adopting safety guarantee measure to insure project construct safety and sing accident controlling technique to analysis latent danger factors to improve safety management level.Construction safety of Poyanghu Railway Major Bridge was affected by personnel, material, machinery, technique and environment etc. Risk management includes risk recognize, risk evaluation, risk control and disposal which should be thought much of, find out risk factors of Poyanghu Railway Major Bridge and control to reduce disadvantage effect.None but carry effective object control on project team, operation team, cost, progress, technique, safety, environment project and risk, construction and accomplish of the project can be insured. At the same time, it afford experience and method for other engineering project.
Keywords/Search Tags:Poyanghu Railway Major Bridge, project construction management, object control
PDF Full Text Request
Related items