FuYang River Comprehensive Control Project Cost Duratiocontrolstudy

Posted on:2012-04-01Degree:MasterType:Thesis
Country:ChinaCandidate:S W ChenFull Text:PDF
GTID:2189330332494771Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
After the foundation of the state, in a very long time, the talents of the project management of our country were very scarce, the level of the project management is very low too, the ones that have caused in a lot of of fund, quality, manpower and progress,etc. in a lot of key construction projects are out of control seriously directly, last or unrestricted additional investment, or a in all desperation one vie for, catch up with time limit, have influenced the whole quality of the construction project seriously, even has caused a lot of serious incidents.The city river system is an important component of the whole ecosystem of city, river system of comprehensive administration city, for maintain one ecological balance of city, optimize one view of city, improve present living environment have important meaning very. We a lot of large and medium cities of water conservancy already carry out the transition come city water conservancy construction of centre from rural water conservancy construction of facilities especially construction of facilitieses at present, water conservancy is developed and changed to environmental water conservancy progressively from the city, continue and transform from environmental water conservancy to the ecological water resources, urban comprehensive administration of water environment work, cause attention of various circles of society gradually already.Have explain the composition of the cost of construction project at first, has introduced its definition, form with form detailed description of chart all of cost make up the factor. And has made detailed explanation to every meaning which made up the factor. After proving meaning and composition of the cost, this text begins the method that the deep research cost controls, mainly proceed with two respects and carry on research, and organize the measure for the economic measure respectivelyThen elaborated the engineering construction project time limit for a project control research theory, first showed the time limit for a project meaning, then, has carried on the introduction and the analysis separately regarding the influence engineering construction project time limit for a project factor.These factors mainly include the subjective factor and the objective factor two big aspects.Afterwards, proposed the time limit for a project control 4 principles, dynamic control principle, system principle, information feedback principle as well as elastic principle.Meets down, to the time limit for a project control work content, including controlled, in beforehand the matter controls, afterwards controls has made the concrete introduction and the earnest analysis.In above research analysis foundation, proposed the corresponding time limit for a project control measure.
Keywords/Search Tags:Construction project, The cost is controlled, Control in time limit
PDF Full Text Request
Related items