Font Size: a A A

Study On Cost Control Of Construction Project

Posted on:2018-06-05Degree:MasterType:Thesis
Country:ChinaCandidate:X F LuoFull Text:PDF
GTID:2359330536468643Subject:Project management
Abstract/Summary:PDF Full Text Request
For a construction enterprise,its experience in the production of the final objective is to maximize the economic benefits.In the project management process,all initiatives are based on cost control in order to reduce the cost of access to benefits,if the price of construction products has made it clear,the costs will be the key for enterprises to obtain benefits.Focused on cost control work,is promoted Enterprise economic and market competitiveness upgrade of important means,construction enterprise should active set cost control concept,introduced,and training high quality of cost control talent,established and perfect cost control mechanism,from engineering of enrollment bid,and construction organization design,and construction process management,and material procurement,and duration planning,and completed settlement,all aspects,full for cost control work,reduced enterprise in project in the not necessary of spending,upgrade enterprise of General profit space,To increase the income,rising business position in the market.Cost effective control of the project,not only is necessary to corporate economic responsibility,but also the necessary means to improve management capacity.Cost of the project is a comprehensive index,and full project management of it to show.Regardless of which sector,which is the company's number of employees working there will result in higher project costs,and must be actively promoting cost in enterprise internal control system,a system.Must be implemented strictly in accordance with the Division of responsibilities and organization work,positive communication,strengthen coordination,build transverse to the comprehensive cost control,vertical accountability mechanisms.And through the application of cost indexes,effective testing of propulsion.When it finds a problem,it must first take the necessary measures and means to enhance project management.Building construction project cost control covers has human,and material,and financial and market information and environment,factors,involves policy,and various market economic policy,and building market big environment,the aspects of outside factors,and to enterprise project for gravity and formed of different professional functions sector of enterprise internal structure,these internal link rendering many staggered distribution,mutual between has nonlinear movement,while also and outside constantly interactive with itself of various material and information data.This makes business management,project cost control access in a pivotal position.
Keywords/Search Tags:The lowest cost, Full cost control, The cost of quality, Time and cost, Cost to account
PDF Full Text Request
Related items