| The S project is the PetroChina Jilin Petrochemical Co "eleven five" key investment projects, the project is located in the eastern part of the PetroChina Jilin Petrochemical Co factory area, project a total investment of22800000yuan. Consists of four main parts of hydrofining unit, intermediate raw material tank, tank group District, railway parking lines and other components, in order to save the project investment, S project is based on the original abandoned device in the old part of the equipment pipeline, device processing model oil refinery construction, building and rebuilding project belongs to. Construction area, restricted, adjacent to the plurality of the production equipment, the project construction complex involves the old device removal, civil engineering, equipment installation, pipeline installation, electrical and instrument installation and many other operations, project safety management risks.Construction safety management is an important content of the project construction management. According to the characteristics of large oil refining project construction safety management, taking S project as an example for the whole project was (WBS) engineering structure analysis, based on the analysis of safety science theory, combined with the enterprise HSE management mode, analyzes the risk in S project, put forward corresponding safety control measures safety, due to the necessary control measures, the S project in the implementation process effectively evade the risk, to achieve the security goal. At the same time, the successful implementation of S projects for Jilin Petrochemical Co building similar into scientific, standardized track accumulated certain experience, but also for the future of enterprise product core competition ability, speed up the upgrading of industrial technology, has very important significance to create hundreds of billions Yuan comprehensive energy Petrochemical Industries Co target. |