At present, along with the electrical system's rapid development, the quantity and scale of the large-scale electric power plant is bigger and bigger. As the quantity of the overhaul of the large-scale electric power plant is bigger and bigger, the demand of the electricl system is higher and higher, especaily to the electrical profession. Without the overhaul workers of own, to meet the haigh quality demand, besides the time is so limit.So the electrical profession must have a effectual manage procedure.As the example of the overhaul of the #5 generating unit of TUOKETUO power plant, to study how to resolve the problems have happened in many power plants in the fresh largh-scale power plant, and to resolve the thoughts of the Total Provention Maintenance in the management of the overhaul of the electrical profession, to make the effect better, the reliability higher, the cost fewer, the process safer.
|